Published October 24, 2026

Boca Raton's Memorial Park Plan: What It Means for Downtown Homes

Author Avatar

Written by Chris Cusimano

Illustration of Boca Raton's Memorial Park civic area with palm trees, tennis courts and City Hall under a bright sky

If you own a home or condo in downtown Boca Raton, the land at the center of your neighborhood is being replanned right now. The city has started a master plan for Memorial Park and the civic buildings around it, and it wants residents to help shape what comes next. What gets decided here will touch the park, the tennis courts and the public spaces you walk past every day.

What's happening with Memorial Park

Boca Raton has hired Chen Moore and Associates to lead a community-driven master plan for Memorial Park and the surrounding Downtown Civic Area. City Council approved the contract on September 8 at $519,925, with up to $52,000 more set aside for unexpected needs, according to Boca Post's coverage of the vote. The vote was 3-0, with one member recused and one absent.

The study covers roughly 17 acres of city-owned land: Memorial Park, City Hall, the Community Center, the Tennis Center, the Singing Pines buildings and the public spaces around them. The city is clear on one point: no final design, layout or plan has been approved.

Why downtown homeowners and buyers should care

When people shop for a home near downtown, they're buying more than square footage. They're buying the walk to the park, the tennis courts down the street and what the corner looks like. This plan touches all of that.

For owners, this is the chance to have a say in what sits next to your investment for the next decade or more. For buyers watching downtown condos and homes, it's something to track. A plan that keeps and improves green space and public facilities tends to add to an area's appeal, and a long stretch of uncertainty can make people hesitate. Right now we're in the listening phase, which is the easiest time to be heard.

For sellers, nothing changes today. There is no approved plan and no construction. If a buyer asks, the honest answer is that the city is gathering input and a final plan is still months away.

How the process works

The contract runs in four phases over roughly six months, per the staff memo reported by Boca Post:

  • Getting started: interviews with each council member, meetings with the Parks and Recreation Board and the Greater Boca Raton Beach and Park District, and an outreach plan that goes back to council before any public sessions begin.
  • Listening: up to six small-group listening sessions, up to six stakeholder sessions, a community survey and appearances at two community events.
  • Design workshop: a two-and-a-half-day charrette that produces up to two concept options for City Hall, the Community Center, the Tennis Center and Singing Pines.
  • Final plan: a draft presented at a council workshop, then a final plan for council to consider.

Some background: in March 2026, voters did not approve the earlier One Boca downtown campus proposal. In May, council directed staff to start this new master plan process instead, as outlined on the city's Memorial Park Project page.

Where it stands right now

As of this writing, the city has not posted listening-session dates or the community survey link. The consultants' outreach plan has to go back to council before sessions are scheduled, so the next public signal will likely show up on a council agenda or the project page. If a final plan follows the roughly six-month contract, it would reach council around spring 2027, though the city has not announced a date.

Here's how I see it

This is one of those stories that looks like a city hall item but really comes down to your neighborhood. Memorial Park and the Tennis Center are part of why people choose to live near downtown, and the veterans memorials and green space matter to a lot of longtime residents.

My advice is simple. If you live downtown or you're thinking about buying there, take the survey when it comes out and go to a listening session if you can. A plan shaped by the people who live nearby is usually a better plan, and it is a lot easier to weigh in now than after concepts are drawn.

What to watch next

  • The community survey and listening-session dates, which the city says it will post on the Memorial Park Project page at myboca.us.
  • The design workshop, where up to two concept options get drawn.
  • The draft plan at a council workshop, the first time residents will see real options side by side.

Questions about the process can go to City Hall at 561-393-7700.

Sources: City of Boca Raton, "Memorial Park Project" (myboca.us); Boca Post, "Boca Raton Approves Chen Moore Contract for Memorial Park and Downtown Civic Area Master Plan" (September 9, 2026). Facts verified October 23, 2026.

Thinking about what this means for your downtown home, or wondering how it could affect your plans to buy or sell? Call us, we're friendly.

Call or text 561-289-9305, chris@homesbycusi.com
The Homes By Cusi Team, Keller Williams Realty Boca Raton

Categories

2026, Current Events
Agent profile image in chat bubble
Agent profile image in chat header

Chris Cusimano

| Homes by Cusi | Keller Williams Realty Boca Raton | PLACE | Boca Raton Realtors

Agent profile image in message

or another way